Fakenham Roofers carries out lead flashing, valleys, soakers, and chimney lead work for homeowners in Heacham and the surrounding area.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead is used at every junction between a roof and a wall, chimney, dormer or parapet - anywhere two surfaces meet and water needs to be turned away. Done well, it outlasts virtually every other part of the roof. Done badly, it is one of the most reliable causes of serious water ingress into a property, often going unnoticed until the damage inside is significant.
The work covers lead flashing, stepped and cover flashings, back gutters, valleys, soakers placed under each course of slate or tile at an abutment, and lead-lined gutters on period properties.
Whether the job is a new installation on an extension or a repair to failing flashings around a chimney stack, the standard of the work is what determines whether it holds. This page focuses on one specific question: how do you choose a contractor for lead work, and what should you ask before you agree to anything?
Lead work is a skilled trade within a trade. A roofer who can competently tile or slate a roof may have limited experience with lead, and vice versa. Poor lead work is not always immediately obvious - a flashing can look neat from the ground and still be incorrectly fixed, under-thickness, or missing expansion joints that will allow it to crack within a few years.
Unlike a poorly laid tile, which tends to fail quickly and visibly, a badly dressed flashing may hold for one or two winters before the cracks open up or the pointing fails. By that point the homeowner has often forgotten who did the work, or the contractor is no longer easy to reach. Choosing carefully at the outset is the most effective protection you have.
These are the questions worth putting to any contractor before signing anything or paying a deposit. A confident, experienced tradesperson will answer them clearly. Evasion or vagueness is itself useful information.
Some indicators should make you pause before agreeing to anything:
Once the work is complete, you should be able to see clear evidence of how it was done. The lead should be laid in bays with visible joints between them - not one continuous length running the full width of a chimney or abutment. Where the lead turns into the wall, the mortar joint should be freshly pointed and flush. The lead itself should be neatly dressed to the shape of the tiles or slates beneath it, without visible gaps or lifting edges.
A back gutter behind a chimney stack should hold water and direct it to the sides - ask whether this was checked before the scaffold came down. Step flashings on a sloping abutment should be individually soaked and lapped correctly so water cannot work back up under them.
If you can see the work clearly and it looks tidy and methodical, that is a reasonable sign. If the lead has been bent roughly into place, there are no visible bay joints, or the mortar pointing looks smeared over the top rather than properly packed, those are grounds to raise questions before the invoice is settled.
Many homes in Heacham and nearby have original lead work that is decades old. In some cases that lead is still fundamentally sound and needs only targeted repair rather than full replacement. Original lead that has adequate thickness, no significant cracking, and correctly formed bays can often be re-fixed and re-pointed rather than stripped out.
Where the original work is beyond repair - thinned through oxidation, cracked along multiple bays, or covered in layers of old sealant - a full strip-and-relay is the honest answer. We will always tell you which applies and why, rather than defaulting to the more expensive option.
On listed properties or those in conservation areas, there may be specific requirements about materials and finishes. Lead is generally the only accepted material in those situations, which is one more reason to use a contractor who understands it properly.
Because lead work is difficult to assess from the ground, a roof survey before any quotation is the correct starting point. This lets the contractor assess the code of lead in place, the condition of the mortar chase, whether any underlying timber has been affected, and exactly how many bays of new lead will be needed.
If a contractor is not willing to get on the roof to look before quoting, ask yourself what they are actually pricing. A meaningful quote requires a proper inspection.
If you have lead work that needs attention in Heacham or nearby, call Fakenham Roofers to arrange a roof survey. We will give you a straightforward assessment and a clear explanation of what the work involves.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.