Waiting for a new roof to be fitted on your Swaffham home can be stressful, especially if there is active damage - knowing what you can safely do, and what you should not attempt, makes a real difference.
Call any time. Calls are answered day and night and passed straight to our roofers.
A full roof replacement involves stripping the existing covering down to the timber structure, checking every rafter and batten for rot or damage, replacing unsound timber, and then building the new roof from the underlay up. New breathable membrane underlay goes on first, then treated battens, then the tile or slate covering. Ridges are mechanically dry-fixed, and all flashings - around chimney stacks, abutments, valleys, and soil pipes - are cut and dressed in lead or an approved alternative.
On a standard three-bedroom house the work typically takes three to five days once scaffold and materials are in place. The scaffold itself goes up the day before work starts and comes down a day or two after completion.
Between booking a new roof and the work actually starting, there is usually a lead time while materials are ordered and scaffold is arranged. During that time - and especially if the existing roof has already developed a leak - many homeowners feel the urge to do something. That instinct is understandable, but it is worth thinking carefully about which actions help and which ones make things worse.
Bad weather does not wait for convenient start dates. If a storm damages a roof in October and the scheduled installation is six weeks away, those six weeks need managing carefully.
There are practical steps you can take that are safe, effective, and will not interfere with the planned work:
The temptation to get up on the roof and fix something yourself is strong when water is coming in. In most cases, amateur intervention on a damaged roof creates more problems than it solves, and in the worst cases it causes serious injury.
If water ingress is severe and the installation start date is some way off, a temporary repair may be worth arranging through the roofing contractor rather than attempting it yourself. A professional temporary measure - such as a properly secured heavy-duty tarp fixed at the ridge and weighted at the eaves - can keep water out without causing additional damage or creating a hazard. A tarpaulin draped over the roof and wedged under a few tiles is not the same thing and frequently blows loose in the first wind.
Ask your contractor whether an interim visit to apply a temporary cover makes sense for your situation. It adds a small cost but can prevent significant internal damage while you wait.
A full quote should include scaffold, removal and disposal of the old covering, any standard timber repairs, new underlay, battens, tiles or slates, dry-fix ridge system, and new flashings. Ask specifically whether the quote includes scaffold hire and waste disposal - these are sometimes listed as extras and can add meaningfully to the total if not included upfront.
If your loft insulation has not been touched in many years, a roof replacement is the most convenient time to address it. With the scaffold in place and the roof open, access is straightforward. Current Building Regulations recommend at least 270mm of mineral wool between and over the joists. If your existing insulation is older and thinner, adding to it now avoids a separate job later and reduces heat loss immediately.
Make sure any new or topped-up insulation does not block the eaves gap. A clear 50mm gap at the eaves is needed to allow airflow through the roof space and prevent condensation building up on the timbers.
While the scaffold is up for a new roof, it makes practical and financial sense to address the fascias and soffits at the same time. Rotten timber fascias allow water into the wall plate and roof structure, and replacing them during the roof job avoids a second scaffold hire. uPVC replacements are low maintenance; timber replacements painted correctly can last well but need repainting periodically.
We install new roofs for homeowners in Swaffham and the surrounding area. If you are dealing with an active leak and waiting for work to start, or if you are planning a new roof on a sound structure, call us to arrange a proper inspection and a fully itemised written quote.